Header

Episode 2: A Place Beyond a Boy´s Wildest Dreams

BACK TO OVERVIEW
posted: 2017-06-22

Shortly after the break of dawn, the boys from RP-Tools were ready to transform our old warehouse into a fully equipped workshop.

Youtube: Please update your privacy settings to use this option. More

Shortly after the break of dawn, the boys from RP-Tools were ready to transform our old warehouse into a fully equipped Workshop.
Werkstatt Aufbau Artikelbild 1
In our second video, you can see how fast such a workshop can be constructed when true professionals are at work.

As not a single screw remains untouched on our DD2.JZ, in addition to a hydraulic two-ram lift, which is designed especially for lowered vehicles, RP-Tools also provided us with two sandblasting devices, a fully furnished workshop car, a wheel balancer as well as many other necessary workshop utensils, setting them all up in the old warehouse.

Daniel, Christian and Christoph from left to right (RP-Tools team in the field) are discussing the workshop layout.
Werkstatt Aufbau Artikelbild 2
Once a deserted warehouse, now a workshop where history is made.
Werkstatt Aufbau Artikelbild 3
Before the end of this year, the 2JZE GTE engine in the BMW Z4 will be started with one turn of the ignition key. Until that moment, we suggest you don’t miss any of the exciting videos!

Re-watch all episodes:
Episode 1 - German Beauty Meets Japanese Muscle